IMG_0624
  1. Home
  2. Events
  3. Conferences
  4. FORTINET | TechDay ’25

FORTINET | TechDay ’25

Every event deserves a top performance. 

It doesn't matter if it's a smaller project or a large event - we give the same professional commitment to each. This is proven by the recent technical support for the two-day Techday event for Fortinet. The implementation took place in parallel in two locations. One team was arranging the conference in the hotel, the other was preparing the technology on the pier of Marina Liptov. This procedure allowed for a smooth transfer of the program without time loss. On the first day, the programme took place only in Hotel Grand Jasná, in the evening with the participation of four actors - Mirka Partlova, Karin Haydu, Tomáš Palonder and Roman Pomajb. The second day continued with a conference block in the hotel, followed by the transfer of the participants to the Liptov Marina. There, an evening party was held on the pier with the Showtime Band and DJ Jucky.

Technical setup – Grand Jasná Hotel
In the conference area, we deployed a complete video chain and Meyer Sound X-20 audio system. The setup was tailored to suit the format of presentations and panel discussions.

Technical setup – Marina Liptov
The stage on the pier of Liptovská Mara was powered by a Meyer Sound UPQ, supplemented with four 900-LFC subwoofers. The light design featured Pointe moving heads and our new Cameo OTOS W6– fixtures – the latest lights in our inventory. Their high performance and weather resistance allowed for flawless outdoor operation directly above the water’s surface. We used them to create dynamic stage lighting for the band and the dance floor.

 

Reach out
and we will contact you